
Lagos-Ibadan Expressway Partial Closure: FG Announces Six-Week Traffic Diversion for Repairs
The Federal Government has announced a Lagos-Ibadan Expressway partial closure that will last for six weeks to enable repair works on sections of the busy highway.
According to the Ministry of Works, the temporary closure will affect specific lanes of the expressway, with traffic to be diverted to alternative routes within the corridor. The government said the decision was necessary to carry out critical maintenance aimed at improving safety and extending the lifespan of the road.
The Lagos-Ibadan Expressway is one of Nigeria’s busiest highways, serving as a major link between Lagos, Ogun, and other parts of the country. It also plays a crucial role in commercial activities, with thousands of vehicles—including heavy-duty trucks—plying the route daily.
Officials stated that the repair works will focus on deteriorated portions of the road, including sections that have developed potholes and structural weaknesses due to heavy traffic and weather conditions. Engineers are expected to work round the clock to ensure that the project is completed within the stipulated timeframe.
Motorists have been advised to exercise patience and cooperate with traffic management officials during the six-week period. The Federal Road Safety Corps (FRSC) and other relevant agencies are expected to be on ground to manage traffic flow and minimize congestion.
The government also encouraged commuters to plan their journeys ahead of time and consider alternative routes where possible to reduce delays. Signage and directional markers will be installed to guide drivers through the diversion points.
Residents and regular road users have expressed mixed reactions to the announcement. While some welcomed the move, describing it as necessary for long-term safety, others voiced concerns about possible traffic gridlock and longer travel times during the repair period.
The Federal Government reiterated its commitment to improving road infrastructure nationwide and assured the public that the temporary inconvenience would ultimately result in a safer and more durable highway for all users.